Roof Plan Checklist

Minimum Scale   1:100

ROOF CONSTRUCTION

ROOF PANELS TO BE FIXED IN

ACCORDANCE WITH MANUFACTURERS SPECIFICATION.

ALL RIDGE CAPPING, STEPS, HIPS VALLEYS AND VENT

FLASHINGS TO PROVIDE WATERPROOFING SYSTEM.

PROVIDE REFLECTIVE FOIL BACKED SARKING TO

UNDERSIDE OF ROOF SHEETING. COLORBOND

GUTTERING AND PVC DOWNPIPES TO BE CONNECTED

TO STORMWATER SYSTEMS IN ACCORDANCE WITH THE

LOCAL AUTHORITY.

ENSURE A QUALIFIED PLUMBER/ HYDRAULICS

CONSULTANT REVIEWS THE DOWNPIPE LAYOUTS

PRIOR TO CONSTRUCTION.

 

DOWNPIPE & GUTTERS

ALL SLOTTED GUTTERS AND DOWNPIPES TO BE

INSTALLED TO NCC AND OR AS3500 (RELEVANT PARTS).

MATERIALS USED ARE TO BE COMPATIBLE WITH ALL

COMPONENTS UPSTREAM AND DOWN STREAM.

POSITION OF PROPOSED BUILDING TO BE VERIFIED BY

BUILDER ON SITE.

LOCATION OF EXISTING SERVICES TO BE VERIFIED BY

BUILDER PRIOR TO CONSTRUCTION.

 

STORMWATER NOTE

ALL STORMWATER DRAINAGE SHALL BE IN

ACCORDANCE WITH A.S. 3500.3.

ALL STORMWATER DRAINAGE SHALL BE IN

ACCORDANCE WITH S.C.R.C. GUIDELINES TO MINIMISE

EROSION AND SCOURING. STORMWATER FLOW OTHER

THAN NATURAL OVERLAND FLOW SHALL NOT BE

DISCHARGED ONTO NEIGHBOURING PROPERTY.

ALL STORMWATER DRAINAGE DESIGN IS PRELIMINARY

AND SHALL BE CONFIRMED BY A LICENCED

HYDRAULICS DESIGNER.